Ethan Banks Rack Prep Continues
I spent a couple of hours after work last night working on my CCIE rack. I got all of the V.35 cables connected. I got a bunch of the short switch-to-switch interlinks connected, since I have a bunch of 1-footer pre-made cables ready. I got the terminal server racked. I wiped configs off of all the switches and routers, gave them hostnames, noted the flash, RAM, and currently installed IOS.
Read more at CCIE Candidate.
Friday, August 3, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment